Analisa Perbandingan Rencana Anggaran Biaya Pekerjaan Pelat Lantai Bondek Antara Lantai 1,2,3 dan 4 pada Pembangunan Gedung Pelayanan
Abstract
The world of construction in Indonesia is growing rapidly to help meet people's needs, give them comfort, and help them to have advanced prosperity. For this reason, the number of construction projects currently in progress is large, so engineers must pay attention to having good quality construction. To get good quality construction results, there are three aspects that must be considered: cost, quality, and time. the three aspects are very high, especially related to the cost aspect. A good, accurate, and efficient budget plan is reflected in the good results of the project. An efficient budget plan will not only make the project successful, but will also benefit the engineer. Before starting a project, the engineer needs to make a budget plan, the first is the Cost Budget Plan (RAB). Therefore, the authors analyze the Permen PU 28 / PRT / M / 2016 budget plan for the work of the integrated service building building of the tribhuwana tunggadewi malang university. In this analysis, the Budget Plan (RAB) based on Minister of Public Works Regulation 28 / PRT / M / 2016 is Rp 485,094,171
References
Imannda, Nur (2018) Analisis Perbandingan Rencana Anggaran Biaya (RAB) Pekerjaan Pelat Beton Konvensional Dan Pelat Beton Bondek (Artikel Ilmiah) Mataram : Universitas Mataram
Nurani, Izmi (2017) Analisa Perbandingan Rencana Anggaran Biaya Pekerjaan Pelat Lantai Beton Bertulang Konvensional Dan Pelat Lantai Bondek Pada Pembangunan Ruko 3 Lantai Di Balik Papan (Tugas Akhir) Balik Papan : Politeknik Negeri Balikpapan
Farida, Nida (2018) Perbandingan Estimasi RAB Proyek Existing Terhadap RAB Berpedoman PERMEN PU 28/PRT/M/2016 Pada Pekerjaan Struktur (Tugas Akhir) Yogyakarta : Universitas Islam Indonesia
Arafuru, (2015) Pengertian Rencana Anggaran Biaya (RAB) Proyek Bangunan Akses online 11 november 2015. (http://arafuru.com/m/sipil/pengertian-rencanaanggaran-biaya-rab-proyek bangunan.html)
Informasi, Kanal (2016) Pengertian Data Sekunder Dan Data Primer Akses online 19 oktober 2016 .(https://www.kanalinfo.web.id/pengertian-data-primer-dan-datasekunder)
Permen PUPR (2016). Analisa Harga Satuan Pekerjaan (AHSP) Bidang Cipta Karya. JDIH Kementrian PUPR. 2016. Analisa Rencana Anggaran Biaya Pada pembangunan gedung pelayanan terpadu universitas tribhuwana tunggadewi malang