Perencanaan dan Pengendalian Jadwal dengan Menggunakan Program Microsoft Project Profesional 2013 (Studi Kasus: Struktur Gedung Pelayanan Terpadu Universitas Tribhuwana Tunggadewi Malang)

  • Antonius Nahak Program Studi Teknik Sipil, Fakultas Teknik, Universitas Trihuwana Tunggadewi Malang https://orcid.org/0000-0002-5646-0722
  • Nawir Rasidi Program Studi Teknik Sipil, Fakultas Teknik, Universitas Trihuwana Tunggadewi Malang
  • Handika Setya Wijaya Program Studi Teknik Sipil, Fakultas Teknik, Universitas Trihuwana Tunggadewi Malang
Keywords: Microsoft Project 2013; Project Scheduling; Construction Management

Abstract

A project can be said to be successful if the implementation process can be completed on time as planned. Inappropriate planning and control in a project can result in waste of resources and will also lead to failure in achieving the objectives of the project. Therefore, in planning a project schedule using the 2013 Microsoft Project Professional Program, the first thing to do is to enter the activity data that will be carried out such as the project start date, type of activity, duration of time, resources, and so forth. In the planning and controlling stages of the project schedule using the 2013 Professional Project, one method that can be done is to add overtime to an activity if there is a delay. From the planning and control of the schedule carried out on the Integrated Service Building Structure building project at the University of Tribhuwana Tunggadewi Malang using the 2013 Microsoft Project Program for 68 days, and in the control phase there are several work items that experience a Critical trajectory. extra overtime hours. So that work items that experience a critical trajectory can be overcome.

References

Chatfild, Carl & Johnson, Timothy. (2013). Step by Step Microsoft Project 2013.Washington: Microsoft Press. [2] Emanuel, Andi Wahju. Toba, Hapness. & Djalaksana, Yenni M. (2009).Panduan Mengelola Microsoft Proyek Dengan Microsoft Project Professional 2007.Yogyakarta : Graha 11mu.

Penerbit Andi & Madcoms.(2013). Kupas Tuntas Microsoft Project 2013. Yogyakarta .Andi Offset.

Kelana, P., 2010, Optimalisasi Penggunaan Sumber Daya Manusia Dengan Metode Resource Leveling Menggunakan Bantuan Microsoft Project 2007, Penerbit Fakultas Teknik Jurusan Teknik Sipil Universitas Sebelas Maret. Surakarta

Napsiyana, A.G., 2007, Perencanaan Dan Pengendalian Jadwal Dengan Menggunakan Microsoft Project Propfesional 2013 Dalam Pengelolaan Proyek, Penerbit Fakultas Teknik Universitas Siliwangi. Tasikmalaya.

Supranto, Limakrisna, Nandan. (2012) . Petunjuk Praktis Penelitian Ilmiah Untuk Menyusun

Analisa Harga Satuan Pekerjaan (Al-ISP) Bidang Pekerjaan Umum.Jakarta Kementerian Pekerjaan Umum.

Trihendradi C, 2009. Microsoft Project 2007: Langkah Cerdas Merencanakan, Menjadwalkan dan Mengontrol Proyek, Andi Offset, Jakarta.

Published
2019-10-25