Perhitungan Biaya Kontruksi Saluran Bermaterial Pasangan Batu Pada Kegiatan Perencanaan Saluran Drainase Jalan di Simpang Seputuk STA 4+400 – 8+600

  • Angelinus Robert Prodi Teknik Sipil, Universitas Tribhuwana Tunggadewi
  • Kiki Frida Sulistyani Prodi Teknik Sipil, Universitas Tribhuwana Tunggadewi
  • Suhudi Suhudi Prodi Teknik Sipil, Universitas Tribhuwana Tunggadewi
Keywords: Drainage, channel dimensions, Cost Budget Plan

Abstract

An environmentally sound drainage system as a system that is able to keep a facility, especially roads, dry, and can handle problems such as flooding and puddles on the surface, Jalan Simpang Seputuk is an active crossing that is used but there are several obstacles on the left and right side of the road, namely there are puddles of water when it rains, therefore the use of drainage functions is very important. This research uses a quantitative approach method and with secondary data analysis. The study location is topographically in a low and flat position near the Sesayap river which is the downstream of 2 watersheds namely the Seputuk river and the Rian river, the cost budget plan for excavation of soil, soil backfill and left channel stone masonry starts from STA 4+400 - 8+600 Rp2,067,403,777.00. The budget plan for excavation, backfill and right channel pairs starting from STA 4+400 - 8+600 IDR 1,807,281,377.00. With the results of the total cost of planning the drainage channel STA 4 + 400 - 8 + 600 right and left channels IDR 3,874,685,154.00.

References

T. E. Saragi, Y. R. Saragi, E. O. Zai, And M. Harefa, “Analisis Dan Perencanaan Sistem Drainase Jalan Pelita 1 Kecamatan Medan Perjuangan Kota Medan,” J. Visi Eksakta, Vol. 2, No. 1, Pp. 97–110, 2021, Doi: Https://Doi.Org/10.51622/Eksakta.V2i1.

F. Dwiyan, “Perhitungan Biaya Dan Waktu Pekerjaan Drainase Pasangan Batu Kali Dengan Konsep Penambahan Biopori (Studi Kasus: Perumahan Rembangan Hill Residence, Jember),” Universitas Jember, 2017.

A. B. Siswanto And M. A. Salim, Manajemen Proyek. Semarang: Cv. Pilar Nusantara, 2019.

Kementerian Pekerjaan Umum Dan Perumahan Rakyat, Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan Perumahan Rakyat. Indonesia: Bn Th 2022/No 9, 2022.

S. Damayanti, “Rencana Anggaran Biaya (Rab) Rehabilitasi Saluran Primer Penangkis Daerah Irigasi Rawa Batu Ampar Tulang Bawang,” Politeknik Negeri Lampung, 2022.

N. I. Noviyanti, M. Charits, And C. Muharis, “Perencanaan Ulang Saluran Drainase Jalan Raya Berwawasan Lingkungan Di Kecamatan Gumukmas Kabupaten Jember,” Technovatar J. Teknol. Ind. Dan Inf., Vol. 1, No. 1, Pp. 47–57, 2023, Doi: Https://Doi.Org/10.61434/Technovatar.V1i1.107.

I. Hendriyani, R. Pratiwi, Rahmat, And M. D. Sartika, “Kajian Saluran Drainase Berdasarkan Curah Hujan Di Kelurahan Karang Joang Balikpapan,” J. Transukma, Vol. 4, No. 1, Pp. 12–21, 2021, Doi: Https://Doi.Org/10.36277/Transukma.V4i1.106.

D. Despa, A. Novalia, And A. Purba, “Review Desain Pekerjaan Struktur Saluran Pasangan Batu Kali (Ds-5) Dengan Saluran Pracetak Sebagai Sarana Pendukung Jalan Di Area Tol Kayuagung Palembang Betung Paket Ii Seksi 3,” J. Profesi Ins., Vol. 4, No. 3, Pp. 7–12, 2023, Doi: Https://Doi.Org/10.23960/Jpi.V4n1.91.

Kementerian Pekerjaan Umum Dan Perumahan Rakyat, Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan Perumahan Rakyat. Indonesia: Bn Th 2023/No 683, 2023.

A. H. Septian, “Rencana Anggaran Biaya (Rab) Saluran Drainase Jalan Raya Ruas Lempasing - Padang Cermin (Sta 07+500 – Sta 08+500) Kabupaten Pesawaran,” Politeknik Negeri Lampung, 2021.

Published
2024-06-23