Kajian Teori Empiris Manajemen Waktu pada Pelaksanaan Proyek Pembangunan Unit Rumah Tinggal di Waikabubak, Sumba Barat, Nusa Tenggara Timur dengan PERMEN PU PR 2016

  • Simon Stenly Tala Pessy Program Studi Teknik Sipil, Fakultas Teknik, Universitas Tribhuwana Tunggadewi Malang
  • Suhudi Program Studi Teknik Sipil, Fakultas Teknik, Universitas Tribhuwana Tunggadewi Malang.
  • Handika Setya Wijaya Program Studi Teknik Sipil, Fakultas Teknik, Universitas Tribhuwana Tunggadewi Malang
Keywords: government regulation,, public works housing,, time management

Abstract

Provide legal certainty, protecting the dam trial, provide a sense of fairness, as well as creating order is the purpose and benefits of the existence of the Act. Similarly, in the world of construction projects. In the world of construction known regulation of theMinister of public works Housing Legislation in Indonesia was established by the President to the Minister related to the running of the Statute accordingly. MINISTERIAL REGULATION PU PR No. 5/2016 About Permit Building parts of the one-storey building classification and MINISTERIAL REGULATION No. 28/ 2016 PUPR of unit price analysis of the field of public works part 4 field of copyright works is the rule be a reference to analyze the writing of the thesis. The object of the research was the execution of the construction of the housing units lived in Waikabubak, West Sumba. Quality, cost, time is a very important point in the world of construction. Comparative analysis of management time into material for comparative studies i.e. Time planning with an implementation time in customize according to MINISTERIAL REGULATION PU PR.

References

[1] PERMEN PUPR No. 28/PRT/M 2016 Tentang Analisa Harga Satuan Bidang Pekerjaan Umum (AHSP).
[2] PERMEN PUPR No. 5 /PRT/M 2016 Tentang Izin Mendirikan Bangunan (IMB).
[3] Zyahreza Haruna., 2015, Tugas Akhir: Analisa Penerapan Manajemen Waktu Pada Proyek Pembangunan Gedung Pendidikan Terpadu (Study kasus Politeknik Negeri Manado), Jurusan Teknik Sipil Fakultas Teknik Politeknik Negeri, Manado.
[4] Agung Hardiyanto., 2015, Tugas Akhir: AnalisaPengendalian Manajemen Waktu Dan Biaya Proyek Pembangunan Hotel Dengan Network CPM (study kasus Batiqa Hotel Palembang) Jurusan Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Surakarta.
Published
2019-07-24