Abstract

The world of construction competition is getting tighter, because many contractors are competing for jobs. Contractors are required to have a strategy in winning a tender. The financing aspect becomes the center of attention for re-analysis with the aim of seeking savings. This study aims to determine the effect of using value engineering on the wall on material costs and wage costs. This study uses survey techniques, namely in the form of observation data, interviews, and literature studies, the data will be classified into primary data and secondary data. Data sources can be obtained from sources, events or activities, and documents. Analysis of this study uses the PERMEN PU 2016 Malang City. The results of the calculation of the cost of construction materials in the Comparison of Material Costs of Red Brick, Light Brick and Brick making found that the percentage of red brick material costs by 36%, the percentage of light brick material costs by 19%, while the percentage of cost of brick materials is 45%. Analysis for comparison of the amount of wages to be paid, namely the percentage of red brick wage costs of 30%, the percentage of light brick material costs by 40%, while the percentage of the cost of brick materials is 30%. From the calculation data for material costs, lightweight brick is the most economical and economical material compared to red brick and brick making, and for the wage costs of red brick and brick making is the most economical in terms of wage costs. For further research the writer gives advice so that he can add the calculation of the implementation time, the tools used and so on.

References

[1] Dell’Isola, PE, Alpphonse.,1997. Value Engineering Practical Aplpications for design, Construkctiom, Maintenance and Operations. Kingston: R.S. Means Company. Inc.
[2] Chandra. S. Robert H Mithcel, 1986, The Application Of Value Engineering And Analysis Design And Construction. Jakarta.
[3] Lawrence D Miles, 1972., Techniauesn of Value Analysis and Engineering, McGraw Hill Book Company.
[4] Donomartono, 1999. Aplikasi Value Engineering Guna Mengoptimalkan Biaya Pada Tahap Perencanaan Konstruksi Gedung Dengan Struktur Balok Beton Pratekan. Tugas Akhir JTS. Surabaya : Fakultas Teknik Institut Teknologo Sepuluh November.
[5] Sahid, M.N dan Soharto I. 2010. Analisa Perbandingan Produktivitas Kerja Pada Pekerjaan Bata Konvensional dengan Dinding Balok Hebel. Simposium Nasional. Universitas Muhammadiyah Surakarta. Surakarta.
[6] Ningrum, Diah Niken Kusuma. 2014. Analisa Perbandingan Produktivitas Pemasangan DInding M-PANEL dan Dinding KOnvensional Batu Bata (Studi Kasus: Proyek Pembangunan Ruko Modern Arcade di Tangerang. Skripsi. Jakarta: Universitas Mercu Buana.
[7] Yayasan Dana Normalisasi Indonesia, (1978), Bata Merah sebagai Bahan Bangunan edisi ke-2, Bandung YDNI, NI-10.
[8] Susanta. (2007). Dinding. Jakarta: Penebar Swadaya.
[9] SNI AHSP-PermenPUPR28. 2016. Tata cara perhitungan harga satuan pekerjaan dinding untuk konstruksi bangunan gedung dan perumahan.
[10] Ibrahim, Bachtiar. 2001. Rencana dan Estimate Real of Cost. Jakarta: Bumi Aksara.
[11] Arikunto, Suharsimi. 2010. Prosedur Penelitian: Suatu Pendekatan Praktik. Jakarta: Rineka Cipta.
Published
2019-07-25